RATES

These rates have been in effect since June 1, 2026. The minimum landing fee is $30, regardless of the aircraft's MTOW.

Landing fees

Fares

Minimum mass

Over

Maximum mass

Without exceeding

Pricing*

Today

--

0

5 000 kg

15.30¹ $ / 1 000 kg

5 001 kg

15 000 kg

8.25 $ / 1 000 kg

15 001 kg

and more

9,75 $ / 1 000 kg

Touch-and-go

-

75% of standard fees

Night landing²

-

200% of standard fees

Airport Improvement Fee (AIF)

AIF

Passengers using the public terminal

$3 per passenger upon boarding

AIF

Outside the public terminal

$10 per seat*

* Rate applicable to departing aircraft with more than 7 seats in their standard configuration.

Cost in CAD $ for overhead fees

Descriptions

Details

Tariffs

Hourly labour rate (straight time)

Field staff

$70

Supervisors / Administration

$100

Management / Professionals

$135

Hourly field intervention rate – Operator and machinery (1)

Operations and escort pickup truck

$100

De-icing spreader truck

$350

Wheel loader

$250

Plow-broom

$450

Snow blower

$400

Fire emergency (2)

Airport firefighters – intervention under 3 continuous hours

$4,000

Airport firefighters – intervention over 3 continuous hours

Base fee ($4,000) plus $1,000/additional hour

Consumables

Based on actual use

Events – Special conditions

Runway incident / FOD / Physical damage

Minimum 3 hours based on hourly field intervention rate

External provider

External provider fees plus 15% administrative charge

Runway condition report outside regular operating hours

$400

Mandatory airport firefighter presence outside regular operating hours

$1,500/hour

Permits – Fixed fees

AVOP – Written test fee

$75

AVOP – Practical test fee

$150

Radio operator test

$100

Work at height requiring airspace zoning analysis

Work inside airport grounds (intra-muros, on-site partner)

$4,000

Work outside airport grounds (extra-muros)

$6,000

Temporary work – Mobile cranes

$1,800

Permit issuance

New construction on vacant land

Minimum of $25,000, determined based on the project

Work at Height ($) - Projects on airport property (on-site) and external projects (off-site)

Fees vary depending on project complexity and potential operational impacts

Preliminary construction project review and coordination with designated authorities (off-site)

$250 to $500

Cranes and Elevated Equipment (on-site)

Single

$150 to $250

Multiple

$250 to $350

Expedited request (≤72 hours)

$350 to $500

Extension of use or repeat request

$75 to $250

Construction Permits ($) - Projects on airport property (on-site)

Fees are determined based on the value of the project

Total Construction Costs

$0 to $1,000

$150

$1,001 to $200,000

$150 plus $13.50 for each $1,000 increment above $1,000

$200,001 to $800,000

$2,837 plus $13.25 for each $1,000 increment above $200,000

$800,001 to $1,500,000

$10,787 plus $12 for each $1,000 increment above $800,000

$1,500,001 or more

$19,187 plus $9 for each $1,000 increment above $1,500,000

* The landing fee is calculated using the MTOW of the aircraft rounded up to the nearest 1000 kg. Applicable taxes are additional to the indicated rate.

Admin fees of 10% will be charged for new accounts and for all accounts with no email for paperless invoicing. Please contact us with your email address in order to update your file and remove future admin fees: receivables@cyhu.ca

Late payment fee 2.5% per month.

Bi-monthly billing.

¹ The minimum landing fee is $30, regardless of the aircraft's maximum takeoff weight.

² The restricted period for night flights at MET is from 11:00 p.m. to 7:00 a.m.